The **Issue List** is the proof behind the numbers on your chart. It shows the exact issues that make up metrics, so you can validate the data behind trends and anomalies.

In the **WIP Aging chart**, there are two separate [Breakdowns](https://brokenbuild.atlassian.net/wiki/spaces/WIP/pages/4527423578) and corresponding Issue lists:

1️⃣ For items displayed on the chart - currently in progress:

2️⃣ For historical completed issues used as benchmarks for highlights - their scope can be configured in the [Highlights](https://brokenbuild.atlassian.net/wiki/spaces/WIP/pages/4799398012) menu:

![image-20260317-162647.png](media://29f7ffb6-c2b6-4854-b909-c8f5c1209a27)

In the **WIP Run chart**, there is only one Breakdown and Issue list, which include all issues within the chart scope:

![image-20260317-163418.png](media://fe5aba0e-5b57-44c9-abdb-efcaac9e8a75)

You can click **Find issues** from any Breakdown segment to filter the Issue List to show only the relevant issues:

![image-20260318-173947.png](media://8fc1aa0f-c999-444b-a4bf-668f3df7277a)

> Macro (toc)

## Configuring the table columns

You control what information is displayed in the Issue List table.

1. Click **Columns** at the top of the table.

![image-20260318-174107.png](media://0389f2d2-e079-4636-9072-6d42845f1690)

2. Use the checkboxes to **add** or **remove Jira fields**.

![image-20260318-174156.png](media://2527dc30-501f-423e-8884-b7d013055016)

3. Drag and drop fields to **reorder columns**.

![drag.gif](media://e1d4c529-ea6d-4c10-a694-df5366a12165)

4. Click **Reset** to return to the default view.

![image-20260318-174350.png](media://19a92c9a-d75b-4e5b-8cd9-f255d4fff753)

**Unchangeable columns:**

- Issue key
- Summary
- Story points (or another [estimation field](https://brokenbuild.atlassian.net/wiki/spaces/WIP/pages/4801003582) configured in chart settings)
- Status

![image-20260318-174529.png](media://84d3409c-0c00-4580-9743-e5c2f3b06865)

## How to read the table

- The chevron above the table shows the total number of issues for the selected chart segment.

![image-20260318-174556.png](media://8e934f84-df28-4e6b-9f31-36bfda1aadde)

- Click a column heading to** sort issues** by that field.

![image-20260318-174639.png](media://ab01eac4-8ede-46c0-9758-dffe60bf1d51)

- Click an issue key or summary to open and **edit the Jira work item** directly from the chart.

![image-20250918-083932.png](media://dc706ede-b4a8-46fd-af6e-4dde65f7786f)

## Example columns you can add

### **Assignee**

Use the field balance workload to identify bottlenecks and ensure accountability within the team.

![image-20260318-174909.png](media://fefe78cc-4a78-4a42-b016-f2dbcecdc19e)

### **Project**

Useful in cross-project reporting to understand how work is distributed across initiatives.

![image-20260318-174928.png](media://d3cfe05b-18af-4e8d-b016-0543788a9a69)

### Parent (Epic)

Organizes work items by parent epic, making it easier to analyze effort allocation and monitor progress.

![image-20260318-174959.png](media://da400305-1099-422b-92a1-96c6e1d1c81f)


### Many more

You’re not limited to the examples above. The issue list can display **any Jira field** that exists in your instance, including custom ones. For example:

- **Components** – functional areas or subsystems of your product.
- **Fix Version ** – releases linked to the issue.
- **Priority / Severity / Risk level** – useful for triage and compliance.
- **Epic link / Parent** – see how individual items roll up into larger initiatives.
- **Labels / Tags** – flexible way to categorize issues.

 Experiment with different options to surface the information most valuable for your reporting needs.